Global Upfront Newspapers
Breaking NewsCoverNewsWorld News

AfDB approves $1.2 million grant to Ethiopia for feasibility study on constructing link bridge with Sudan

The African Development Bank’s Board of Directors has approved a $1.2 million grant to Ethiopia’s government to finance a feasibility study for construction of a standard-gauge railway (SGR) link between Ethiopia and neighbouring Sudan.

The grant, from the African Development Fund, the Bank Group’s concessional-rate lending arm, would cover 35% of the total estimated $3.4 million cost of the study. The remaining funding will be provided by the NEPAD Infrastructure Project Preparation Facility (NEPAD-IPPF) in the form of a $2-million grant, and by a contribution of $100,000 each from the two countries involved. The financing was approved in January.

The two-year, comprehensive feasibility study will assess the proposed project’s technical, economic, environmental and social viability, as well as alternative financing arrangements, including a public-private partnership (PPP).

The railway line will link Addis Ababa in Ethiopia to Khartoum in Sudan, with an extension to Port Sudan on the Red Sea. The route, agreed by both governments, stretches 1,522 kilometres between Addis Ababa and Port Sudan.

According to the document presented to directors of the African Development Fund, the absence of a regional arterial route linking Ethiopia, Sudan and other countries in the Horn of Africa is a brake on trade, development and regional integration. The movement of goods and people between Sudan and Ethiopia often requires the use of several modes of transport, which increases costs and lengthens journey times.

The feasibility study’s findings will be keenly awaited because its implementation would benefit a large proportion of Ethiopia’s 110 million people and 43 million inhabitants of Sudan, as well as populations in the wider region.

The proposed project is aligned with the Bank’s Country Strategy Paper 2016-2020 for Ethiopia. It is also consistent with the long-term development goals of the Sudanese Government, as set out in its national 25-year strategy (2007-2031). It also accords with the Bank’s Ten-Year Strategy 2013-2022 and the operational priority of infrastructure development. The proposed project also would satisfy four of the Bank’s High 5 strategic priorities: Integrate Africa, Feed Africa, Industrialize Africa, and Improve the Quality of Life for the People of Africa.

Advertize With Us

See Also

The Latest Singing Sensation Called Anè

Global Upfront

It’s True I Am The Richest Pastor In The World, Says Bishop Oyedepo

Global Upfront

Wike, Stop Misleading Rivers People – PDP State Presidential Campaign Spokesperson

Global Upfront

ANCISRO Seeks To Inspire Socio-cultural Renaissance in Anambra – Nnabuife

Global Upfront

Health Canada approves first clinical trial for potential COVID-19 vaccine

Global Upfront

Nigeria: Tinubu Leaves Abuja Thursday To Attend Saudi-Africa Summit In Rihadh, Saudi Arabia – Presidency

Global Upfront

This website uses Cookies to improve User experience. We assume this is OK...If not, please opt-out! Accept Read More