Global Upfront Newspapers
Breaking NewsBusinessCoverNews

Geometric Power and National Control Centre Map Out Programme on Electricity Supply to Aba, Will Supply 47 MW To National Grid

Geometric Power Ltd and the National Control Centre (NCC) at Oshogbo in Osun State have developed a timetable on how electricity will be supplied to all parts of the Aba Ring-fenced Area in Abia State following the commissioning of the Aba Independent Power Project (IPP)  last Monday.

This is just as Geometric Power leadership has explained that it will send 47MW of electricity to the national grid since Aba and its environs may not absorb more than 94MW right now.

Both parties reached the understanding on Friday following the visit of an NCC team on Thursday to the 188-megawatt Aba Independent Power IPP and the inspection of its facilities the next day.

The IPP includes the 188MW thermal plant located in the Osisioma Industrial Layout of Aba and the Aba Power Electric Company set up to district power to the Aba Ring-fenced Area which comprises nine of the 17 local government areas in Abia State.

“Commercial electricity supply to the nine LGAs began yesterday”, an engineer with the Transmission Company of Nigeria (TCN) who is conversant with the timetable, told our correspondent but advised that his name be concealed in the media because he did not have the authority to speak to the press on this matter.

“It began with the release of 7MW, and 7MW will be added every week until the commissioning phase is over”.

Experts call the method the ramp-up process of commissioning.

With 7MW injected into the system weekly, according to Isaac Ayodele, a former engineer with the defunct Power Holding Company (PHCN ) who is now an energy consultant in Lagos, “all 47MW from the first General Electric (GE) turbine will be supplied to consumers by the end of this month.

“This will be double the quantum of electricity currently supplied to the Aba Ring-fenced Area by the Niger Delta Power Holding Company (NDPHC), which has been just 25MW for months”.

Ayodele continued: “By the end of April, power outages will be a thing of the past in all the 9 LGAs in Abia State serviced by Aba Power, Nigeria’s 12th electricity distribution company and the newest”.

The Geometric Power leadership has explained that the 47MW from the third GE turbine will be sent to the national grid, since Aba and its environs may not absorb more than 94MW right now.

There are indications, however, that the South East Governors will press that the excess 47MW be sold to the Enugu Electricity Distribution Company (EEDC) for use in the five Southeastern states.

A source at the South East Governors Forum in Enugu who pleaded for anonymity told journalists: “We are finalising discussions on this matter”. 

Advertize With Us

See Also

Reconciliation Agreement Between Germany and Namibia Has Hit the Buffers

Global Upfront

Squeeze On Nigerian-owned Fintech Firm Flutterwave Continues As Bank of Ghana Seeks To Review Its Operations

Global Upfront

Nigeria: Send NAF Fighter Jets to Flush Out Terrorists From Hideouts, Senate urge Buhari

Global Upfront

Nigeria: Terror bandits kidnap 4 ‘University of Lafia students,’ Police rescue Kwara monarch’s twin daughters, 3 palace aides

Global Upfront

Usukaloyi: The Spirit of Revolution By Gerald Eze

Global Upfront

Ignore Any Purported Biafra Government In Exile, Its A Ruse, Says IPOB

Global Upfront

International Fury As Russian Separatists Sentence Two Britons, Moroccan To Death For Fighting In Ukraine

Global Upfront

Breaking News: No Mass Retirement of Army Generals

Global Upfront

Nigerians In Poland’s Racist, Tortuous Detention Were Warned Of Consequences Of Staying Back- Says NiDCOM Boss

Global Upfront

Ordeal In DSS Custody For Alleged “Inciting Prophecies” Caused Our Family Relocation Abroad, Will Only Return To A “Better Nigeria” – Prophet Arayomi

Global Upfront

This website uses Cookies to improve User experience. We assume this is OK...If not, please opt-out! Accept Read More